Castello Italia takes another step towards the ecological transition with the installation of a new photovoltaic system at the Casalmorano plant.
The 1,116 modules installed by Inveco Group will be able to generate over 670,000 kWh of electricity, allowing the Cremona-based company of the ARaymond group to save around 30% annually in terms of energy costs.
The system, consisting of Jinko Solar Tiger neo 540 Watt – a very large and powerful module that fits well with Castello’s current industrial coverage – was installed within the established time frame, tested, and brought into operation. Thanks to the solar energy produced, the company will be able to recover the investment made in just 5 years.
With this new operation, Castello confirms its commitment to building a more sustainable future.